Got a little bit done today, given that it was all epoxy work, which when finished, stops all play until the next day.
The 1/2" ply plank was released, and all of the stress fractures were ground out for basalt/epoxy attention:
IMG_3942.jpg
The basalt weave and peel-ply were prepared:
IMG_3941.jpg
4 layers of basalt down the centreline, to reinstate the outer fiberglass skin from where I cut off the keel:
IMG_3943.jpg
Lastly, bassalt/epoxy on all the stress fractures under the hull:
IMG_3944.jpg
And that was it for the day.