
Originally Posted by
Jungle64
Second instalment of 12 pics. Thermolite used for new transom, stringers, deck and forward cabin benches. Amrourcell used for bulk head to forward cabin and for new pod. New aluminium fuel and fresh water tanks. Will have all new electronics, Zip wakes and has a flooded keel through the pod and extends about 600 into the hull, for stability at anchor. Breathers for the flooded keel vent to top of pod.
Had to take the windscreen off to fit it on the flat rack to ship, just sat the screen on the deck. Then while towing from Brisbane Port to Coomera cracked the glass, so had to get a new windscreen made