Page 8 of 8 FirstFirst 12345678
Results 106 to 114 of 114

Thread: Pride half cabin rebuild

  1. #106

    Re: Pride half cabin rebuild

    and why they left this left over timber half glassed in or , the purpose is why , future windlass i guess not sure what it does
    Attached Images Attached Images

  2. #107

    Re: Pride half cabin rebuild

    Quote Originally Posted by catshark View Post
    anybody now what this is ?
    No idea cat shark, but to my eyes it looks home-made


    Shakey - If only I lived near the coast

  3. #108
    Ausfish Silver Member
    Join Date
    May 2004
    Location
    cooloola cove

    Re: Pride half cabin rebuild

    if its on a gunnel its the adjustable slide for the canopy.

  4. #109

    Re: Pride half cabin rebuild

    Quote Originally Posted by Tracker View Post
    if its on a gunnel its the adjustable slide for the canopy.
    I had am adjustable slide but I used a sail track, but I think you have the right idea. My initial thought was a lone angler and this was what he locked onto while fishing, but probably over thinking it.

  5. #110

    Re: Pride half cabin rebuild

    my my how time flys not alot of progress but switched to the trailer part getting it refurbished,, previous owner of this trailer had welded up all the drain holes so i filled em up with fishoil, 8 litres of heavy fish oil into the rails and cross members , just welded 12mm nuts on and drill thru the steel, bolt and thread tape to seal let it slosh around everywhere, and thought id color it in blue hammer finish soemthing diffrent with epoxy enamel three coats and three coats of a gal bite primer undercoat , guards was donated to me as their trailer was burnt in the bushfires so just brand new running gear , still to add a keel roller rack under construction an level the gaurds and bits n bobs
    Attached Images Attached Images

  6. #111

    Re: Pride half cabin rebuild

    Looks good Cat keep at it, where are u up to with the hull?

  7. #112

    Re: Pride half cabin rebuild

    very slow with the hull , have to order some woven and bits from trojan so that will be a while , realisticaly my aim is complete stringers and floor by christmas but its a unknown , as you can relate , its lots of work , chipping away slowly will have to do

  8. #113

    Re: Pride half cabin rebuild

    Yeah i can relate i had many many non motivated weeks even months i recall one time i did no work on the hull for 5 months but a big push for me was my sick mum i just had to get things done

    Motivation is the key stay motivated you'll stay working on the hull, financially its pretty hard too especially when u go epoxy resin and even the cloth at $10-$12 per meter you dont get much for $100 its quiet draining

    Stick at it Cat try order cloths from Colan Australia when there on special i picked up a whole roll of 630gram woven roving on special for $55 from Colan

  9. #114
    Ausfish Silver Member
    Join Date
    Apr 2014
    Location
    Brisbane

    Re: Pride half cabin rebuild

    Any updates?

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Join us