Today I finished building and installing the last two pieces of the helm station; that being the sloping helm station, which will house, electronic instruments, the steering wheel, gauges, and switch panels and the RHS (right hand side) cabinet on which will sit the forward engine controls.
As with the galley, I built the cabinet on the bench which allowed me to fair the fibreglass joins on the inside of the cabinet prior to installing. I also put in conduit from the helm station down through the floor for electrical & hydraulic steering lines and also created a conduit on the RHS to run the throttle and shift cables.
I also put on the first coat of fairing compound on the helm station and the joins where the galley is taped to the floor and bulkhead 3. Once I sand this off and fill & fair once or twice more, I can move to the cockpit.